levo

Contemporary Urban Environments

Cheonggyecheon river restoration in Seoul

  • 3 things to know
  • Component 2

Overview

The restoration of the Cheonggyecheon stream in central Seoul as an urban river restoration project, covering why the river was buried, how and when it was restored, and the environmental, social and economic results and criticisms.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Process

How did removing the Cheonggyecheon highway affect traffic?

Process

Who led the Cheonggyecheon restoration project?

Process

Why did some street traders and shopkeepers oppose the Cheonggyecheon project?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Why was the Cheonggyecheon in Seoul a damaged urban river?

    Model answer

    The stream was polluted and covered with concrete after the Korean War, and an elevated highway carrying about 168,000 vehicles a day was built above it.

  2. 2

    What were the aims of the Cheonggyecheon restoration project?

    Model answer

    To remove the decaying highway, restore the stream as a green corridor, reduce pollution and heat in central Seoul, and regenerate the surrounding business district.

  3. 3

    When was the Cheonggyecheon restoration carried out and how much did it cost?

    Model answer

    Work began in July 2003 and the 5.8 km stream opened in October 2005, at a cost of about 387 billion won (roughly US$281 million).

  4. 4

    Who led the Cheonggyecheon restoration project?

    Model answer

    The Seoul Metropolitan Government under Mayor Lee Myung-bak, who made it an election pledge and later became president of South Korea.

  5. 5

    Why did some street traders and shopkeepers oppose the Cheonggyecheon project?

    Model answer

    Demolition disrupted their trade and many street vendors were moved away from the area, so they feared losing customers and livelihoods.

  6. 6

    Where does the water in the restored Cheonggyecheon come from?

    Model answer

    About 120,000 tonnes a day are pumped from the Han River and from groundwater in subway stations, because the natural stream is dry for much of the year.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

See a huge jump in your memorisation

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Water and Carbon Cycles
Hot Desert Systems and Landscapes
Coastal Systems and Landscapes
Glacial Systems and Landscapes

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

China and .
IndiaAustraliaJapan

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AThe horns have less sand volume, so they move more quickly.
BSand is transported up the gentle windward slope via saltation.
CSand accumulates at the crest.

Build It trains answer structure

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Weathering means breakdown of rock in place.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Contemporary Urban Environments, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.