Edexcel A-Level Geography 9GE0
Tectonic Processes and Hazards
Glaciated Landscapes and ChangeLandscape
Coastal Landscapes and ChangeLandscape
Globalisation
Regenerating PlacesPlaces
Diverse PlacesPlaces
The Water Cycle and Water Insecurity
The Carbon Cycle and Energy Security
Superpowers
Health, Human Rights and InterventionConnections
Migration, Identity and SovereigntyConnections
The Water Cycle and Water Insecurity
Human causes of flooding
- 3 things to know
- Papers 1 and 3
Overview
How deforestation, urbanisation, agricultural drainage and land use changes shorten lag time and raise peak discharge, and how channelisation, embankments, dams and upstream flood protection can increase flood risk.
What you need to know
Answer each one before you reveal it.
What risk do dams pose during extreme flood events?
Why does urbanisation increase flood risk in a catchment?
Questions from this subtopic
Each one with the model answer underneath.
- 1
How does deforestation affect interception and flood risk?
Model answer
Removing trees reduces interception of rainfall by vegetation, allowing more water to reach the ground surface quickly.
- 2
Why does urbanisation increase flood risk in a catchment?
Model answer
Urbanisation creates impermeable surfaces such as concrete and tarmac that prevent infiltration and increase surface runoff.
- 3
How does agricultural drainage affect water transfer in catchments?
Model answer
Drainage ditches and field drains speed the transfer of water from fields to rivers, increasing flood peaks.
- 4
What effect do land use changes have on lag time and peak discharge?
Model answer
Land use changes reduce lag time and increase peak discharge by speeding up water transfer to river channels.
- 5
How does channelisation affect flood risk?
Model answer
Channelisation increases flow velocity, moving floodwater downstream faster and potentially increasing flood peaks elsewhere.
- 6
Why can embankments worsen flooding in some areas?
Model answer
Embankments prevent water from spreading onto floodplains, removing natural storage and transferring flood risk downstream.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in The Water Cycle and Water Insecurity, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.