Average cost and calculating it, reducing waste and price competitiveness, lean production against economies of scale, lead time in product development and the advantages, lower risk and better cash flow of a short one, simultaneous engineering, the social value of less waste, calculating profit, and why lower average cost does not guarantee profit.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define average cost.

Numbers

A firm's total cost is £180,000 at an output of 6,000 units. Calculate its average cost.

Numbers

A firm cuts total cost from £180,000 to £162,000 while still producing 6,000 units. Calculate the new average cost and the percentage fall.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define average cost.

    Model answer

    Average cost is total cost divided by the quantity of output produced.

  2. 2

    A firm's total cost is £180,000 at an output of 6,000 units. Calculate its average cost.

    Model answer

    Average cost is £30 per unit.

  3. 3

    A firm cuts total cost from £180,000 to £162,000 while still producing 6,000 units. Calculate the new average cost and the percentage fall.

    Model answer

    Average cost falls from £30 to £27 per unit, a fall of 10%.

  4. 4

    How does reducing waste lower average cost?

    Model answer

    Fewer materials and hours are consumed for each saleable unit, so the total cost of producing a given output falls.

  5. 5

    How do lower average costs improve a firm's price competitiveness?

    Model answer

    The firm can set a lower price and still cover its costs, so it can undercut rivals whose costs are higher.

  6. 6

    Distinguish between lowering average cost through lean production and lowering it through economies of scale.

    Model answer

    Lean production lowers cost at any given output by removing waste, whereas economies of scale lower cost by increasing the scale of output.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Scarcity, Choice and Potential Conflicts
Enterprise, Business and the Economy
Introducing the Market
The Role of Credit in the Economy

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

Brazil, , India and China.
RussiaMexicoIndonesia

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ABorrowing becomes dearer and saving more rewarding.
BMortgage holders have less disposable income left.
CSpending on credit-financed items falls.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Wage rate means the amount an employer pays for one hour of work.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Productive Efficiency, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.