Recall questions on capacity utilisation and its formula, calculating it and working back to output, and what a figure at or near full capacity means for a business.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define capacity utilisation.

Numbers

State the formula for capacity utilisation.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define capacity utilisation.

    Model answer

    Capacity utilisation is the proportion of its maximum possible output that a business is actually producing, expressed as a percentage.

  2. 2

    State the formula for capacity utilisation.

    Model answer

    Capacity utilisation = actual output ÷ maximum possible output × 100.

  3. 3

    A factory can make 5,000 units a month and is producing 3,600. What is its capacity utilisation?

    Model answer

    Capacity utilisation is 3,600 ÷ 5,000 × 100 = 72%.

  4. 4

    A 120-room hotel sells 2,880 room-nights during a 30-day month. Calculate its capacity utilisation.

    Model answer

    Maximum capacity is 120 × 30 = 3,600 room-nights, so utilisation is 2,880 ÷ 3,600 × 100 = 80%.

  5. 5

    A business working at 85% capacity utilisation produces 10,200 units. Calculate its maximum capacity.

    Model answer

    Maximum capacity is 10,200 ÷ 0.85 = 12,000 units.

  6. 6

    A plant with a maximum output of 800 units a day is running at 65% utilisation. Calculate its actual daily output.

    Model answer

    Actual output is 800 × 0.65 = 520 units a day.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Business Activity
Marketing
People
Operations

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

The Policy Committee.
MonetaryFiscalBudget

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AContribution per unit falls.
BMany more units must be sold to cover fixed costs.
CCash inflows can drop before the extra volume arrives.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Responsibility means the duty to carry out a task that has been given to you.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.