Managing capacity: increasing output, cutting capacity and outsourcing

  • 2 things to know
  • Component 02

Overview

Recall questions on maximum capacity, ways of increasing capacity, rationalisation and the costs of cutting capacity, planned and unplanned maintenance downtime, and the uses and risks of outsourcing production.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What is meant by a business's maximum capacity?

Key term

Why does adding a night shift raise capacity more cheaply than building a new factory?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is meant by a business's maximum capacity?

    Model answer

    Maximum capacity is the greatest output the business can produce in a period using the equipment, premises and workforce it currently has.

  2. 2

    Give three ways a business can increase its capacity.

    Model answer

    It can buy additional machinery, add shifts or overtime, or take on more staff and more premises.

  3. 3

    Why does adding a night shift raise capacity more cheaply than building a new factory?

    Model answer

    The existing premises and equipment are used for more hours, so output rises with no capital spending, although shift premiums push the wage bill up.

  4. 4

    What is the risk of expanding capacity as soon as demand rises?

    Model answer

    If the extra demand proves temporary the business is left with equipment and staff it cannot use, and unit costs rise because fixed costs are spread across capacity that produces nothing.

  5. 5

    What is rationalisation?

    Model answer

    Rationalisation is reducing capacity by closing sites, selling equipment or cutting the workforce so that capacity matches the demand the business actually has.

  6. 6

    Give two costs of reducing capacity.

    Model answer

    Redundancy payments and losses on selling equipment have to be met, and the business loses the ability to respond quickly if demand recovers.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Business Activity
Marketing
People
Operations

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

The Policy Committee.
MonetaryFiscalBudget

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AContribution per unit falls.
BMany more units must be sold to cover fixed costs.
CCash inflows can drop before the extra volume arrives.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Responsibility means the duty to carry out a task that has been given to you.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.