levo

People

Levels of hierarchy, span of control and delayering

  • 2 things to know
  • Component 01

Overview

Recall questions on levels of hierarchy, the chain of command, span of control and subordinates, calculating supervisor numbers and restructuring savings, and the benefits and risks of delayering.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Define a level of hierarchy.

Key term

Define span of control.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define a level of hierarchy.

    Model answer

    A level of hierarchy is a rank in the structure at which all posts carry the same status and authority.

  2. 2

    What is the chain of command?

    Model answer

    The chain of command is the line of authority along which instructions pass down and reporting passes up, from the top of the structure to the front line.

  3. 3

    Define span of control.

    Model answer

    A manager's span of control is the number of subordinates who report directly to them.

  4. 4

    Who are a manager's subordinates?

    Model answer

    Subordinates are the employees who report directly to that manager and are answerable to them for their work.

  5. 5

    A production department has 216 operatives and each supervisor can manage 8. Calculate the number of supervisors needed.

    Model answer

    27 supervisors are needed, because 216 divided by 8 is 27.

  6. 6

    A department of 216 operatives widens each supervisor's span of control from 8 to 12. Calculate the reduction in supervisor posts.

    Model answer

    The number of supervisors falls from 27 to 18, a reduction of 9 posts, because 216 ÷ 8 = 27 and 216 ÷ 12 = 18.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Business Activity
Marketing
People
Operations

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

The Policy Committee.
MonetaryFiscalBudget

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AContribution per unit falls.
BMany more units must be sold to cover fixed costs.
CCash inflows can drop before the extra volume arrives.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Responsibility means the duty to carry out a task that has been given to you.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in People, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.