CCEA A-Level Environmental Technology 3930
Fossil Fuels
Global Action on Energy Conservation and Climate Change
Macrogeneration
Microgeneration
Energy From Wind
Energy From the Sun
Energy From Biomass
Energy Storage
Plastics for the Future
Renewable Energy Investigations
Sustainable Development
Waste Management
Waste to Energy Technologies
Land Contamination and Remediation
Hydrogen Fuel Cells
Transport System Challenges
Energy Performance of Buildings
Emerging Technologies
Sustainable Urban and Rural Communities
The Code for Sustainable Homes
Waste Management
- 6 subtopics
- 18 things to know
- A2 1
What Waste Management covers
Waste Management is examined in Unit A2 1, Building and Managing a Sustainable Future, a written examination. It covers landfill dependence and the landfill tax, waste types, priority waste streams and EU directives, the waste management hierarchy, recycling at a Materials Recovery Facility, landfill decomposition, methane and leachate and engineered landfill: dry tomb and bioreactor designs.
Where it is assessed
A2 1
Building and Managing a Sustainable Future — a written examination.
Check the CCEA specification ↗The 6 subtopics
Each one has its own page.
- Landfill dependence and the landfill taxNorthern Ireland's past reliance on landfill and its current rates, why landfill is unsustainable, siting conditions and NIMBY objections, the landfill tax and its 2026 rate, NILAS, and landfill tax and diversion calculations.Open →
- Waste types, priority waste streams and EU directivesMunicipal, hazardous, inert and biodegradable waste, Northern Ireland's priority waste streams and producer responsibility, the Waste Framework and Landfill Directives, the carrier bag levy and the Circular Economy Package.Open →
- The waste management hierarchyPrevention, preparing for reuse, recycling, energy recovery and disposal in order, why each is ranked where it is, when a lower option is justified, the circular economy, and the hierarchy applied to a plastic bottle and food waste.Open →
- Recycling at a Materials Recovery FacilityClean and dirty MRFs, trommel screens, paper separation, overband magnets and eddy current separators, plastic sorting, glass, aluminium and paper recycling, reprocessing, and contamination with a worked rate.Open →
- Landfill decomposition, methane and leachateThe aerobic, acid and methane-producing stages of decomposition, the composition of landfill gas, methane as a greenhouse gas, leachate, and how moisture, waste type, temperature, pH, rainfall and compaction control breakdown.Open →
- Engineered landfill: dry tomb and bioreactor designsLiners, leachate collection and treatment, cells and daily cover, gas collection, flaring and energy use, borehole monitoring, and the dry tomb and bioreactor designs compared.Open →
What you need to know
Answer each one before you reveal it.
Apply the waste hierarchy to a used plastic drinks bottle.
What are the major types of waste produced in Northern Ireland?
What is a Materials Recovery Facility (MRF)?
What happens during the first, aerobic stage of waste breakdown in landfill?
How does a modern engineered landfill differ from an old dump?
Why has Northern Ireland historically relied so heavily on landfill?
What is municipal waste?
What is the waste management hierarchy?
What is the difference between a clean MRF and a dirty MRF?
What happens once the oxygen in landfill waste has been used up?
Describe the lining system of an engineered landfill.
How has the share of council-collected waste sent to landfill in Northern Ireland changed?
What makes a waste hazardous?
List the stages of the waste hierarchy in order, from most to least preferred.
What happens when collected recyclables first arrive at an MRF?
How does methane production develop as landfill waste ages?
How is leachate collected and treated in an engineered landfill?
Take Waste Management further
The same content, four other ways.
Commonly confused
Pairs that lose marks when they are blurred together.
Dry tomb landfill vs Bioreactor landfill
Dry tomb landfill: a sealed disposal site that keeps water out so buried rubbish barely decomposes. Bioreactor landfill: a disposal site where recirculated liquid speeds decomposition of buried rubbish.
Leachate vs Landfill gas
Leachate: polluted liquid draining from decomposing buried waste. Landfill gas: methane and carbon dioxide released by decomposing buried waste.
Clean MRF vs Dirty MRF
Clean MRF: a sorting plant receiving recyclables already separated by households. Dirty MRF: a sorting plant recovering recyclables from mixed residual waste.
Questions from this topic
Each one with the model answer underneath.
- 1
Why has Northern Ireland historically relied so heavily on landfill?
Model answer
Landfill was long the cheapest and simplest disposal route, and suitable quarries and land were available. Little recycling or energy recovery infrastructure existed until the 2000s.
- 2
How has the share of council-collected waste sent to landfill in Northern Ireland changed?
Model answer
DAERA figures show the landfill rate fell from 74.0% in 2006/07 to 14.0% in 2024/25. Most diverted waste now goes to recycling or energy recovery.
- 3
What were Northern Ireland's recycling and energy recovery rates for council-collected waste in 2024/25?
Model answer
DAERA reported that 50.4% of council-collected waste was sent for recycling in 2024/25. A further 34.3% went to energy recovery.
- 4
Why is over-reliance on landfill unsustainable?
Model answer
Landfill wastes materials and energy that could be recovered. Buried biodegradable waste produces methane and leachate for decades, and landfill space is running out.
- 5
Why is it difficult to find sites for new landfills in Northern Ireland?
Model answer
Local residents usually object to the noise, odour, traffic, litter and vermin a landfill brings. Planning approval is therefore slow and uncertain.
- 6
What geological and hydrological conditions does a new landfill site need?
Model answer
A landfill needs low-permeability ground, such as clay, and a deep water table. A site must avoid aquifers, floodplains and springs so that leachate cannot reach water supplies.
What is inside Levo
Six ways to work the same material.
Waste Management revision questions
- What does Waste Management cover in CCEA A-Level Environmental Technology?
- 6 subtopics: landfill dependence and the landfill tax, waste types, priority waste streams and eu directives, the waste management hierarchy, recycling at a materials recovery facility, landfill decomposition, methane and leachate and engineered landfill: dry tomb and bioreactor designs. Each one has its own page with questions and model answers.
- How is Waste Management organised?
- By the CCEA 3930 specification, subtopic by subtopic, so it matches the order you are taught it in.
Every question in Waste Management, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.