CCEA A-Level Technology and Design 8900
Material Selection and Wood
Metals
Plastics
Composite and Emerging Materials
Processing Materials
Product Analysis and Design Communication
Design for Manufacture, Quality and Safety
Electronic Control SystemsOption A
Microelectronic Control SystemsOption A
Mechanical and Pneumatic ComponentsOption B
Mechanical and Pneumatic SystemsOption B
Designing and Manufacturing ProductsOption C
Product Design in Industry and SocietyOption C
Product Development
Product and System Design and Manufacture
Designing and Manufacturing Products
Manufacturing planning and product evaluation
- 3 things to know
- AS 1 Paper 2
Overview
Work orders, flow process charts, critical path analysis and float with worked examples, batch time, choosing processes by scale, and formative and summative evaluation.
What you need to know
Answer each one before you reveal it.
What is a work order in manufacturing?
What does a flow process chart record that a simple flow chart does not?
Questions from this subtopic
Each one with the model answer underneath.
- 1
What is a work order in manufacturing?
Model answer
A work order is a schedule listing each manufacturing operation in sequence. Each step names the tools, materials, time and quality checks needed.
- 2
What does a flow process chart record that a simple flow chart does not?
Model answer
A flow process chart classifies every step as an operation, inspection, transport, delay or storage. Distances and times are often added, so wasted movement and waiting become visible.
- 3
Which symbols are used on a flow process chart?
Model answer
A circle shows an operation and a square shows an inspection. An arrow shows transport, a D shows a delay and a triangle shows storage.
- 4
Why do manufacturers try to remove delay and transport steps from a flow process chart?
Model answer
Delays and transport add time and cost without adding value to the product. Shorter routes and fewer waits make production leaner and cheaper.
- 5
What is critical path analysis?
Model answer
Critical path analysis models a project as a network of activities with durations and dependencies. The longest route through the network is the critical path, which sets the shortest possible completion time.
- 6
What is float in critical path analysis?
Model answer
Float is the time an activity can be delayed without delaying the whole project. Activities on the critical path have zero float.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in Designing and Manufacturing Products, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.