Overview

Work orders, flow process charts, critical path analysis and float with worked examples, batch time, choosing processes by scale, and formative and summative evaluation.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Process

Justify the choice of manufacturing process for 20,000 identical polypropylene lids with a snap fit.

Key term

What is a work order in manufacturing?

Process

What does a flow process chart record that a simple flow chart does not?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is a work order in manufacturing?

    Model answer

    A work order is a schedule listing each manufacturing operation in sequence. Each step names the tools, materials, time and quality checks needed.

  2. 2

    What does a flow process chart record that a simple flow chart does not?

    Model answer

    A flow process chart classifies every step as an operation, inspection, transport, delay or storage. Distances and times are often added, so wasted movement and waiting become visible.

  3. 3

    Which symbols are used on a flow process chart?

    Model answer

    A circle shows an operation and a square shows an inspection. An arrow shows transport, a D shows a delay and a triangle shows storage.

  4. 4

    Why do manufacturers try to remove delay and transport steps from a flow process chart?

    Model answer

    Delays and transport add time and cost without adding value to the product. Shorter routes and fewer waits make production leaner and cheaper.

  5. 5

    What is critical path analysis?

    Model answer

    Critical path analysis models a project as a network of activities with durations and dependencies. The longest route through the network is the critical path, which sets the shortest possible completion time.

  6. 6

    What is float in critical path analysis?

    Model answer

    Float is the time an activity can be delayed without delaying the whole project. Activities on the critical path have zero float.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Material Selection and Wood
Metals
Plastics
Composite and Emerging Materials

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

The output voltage is V.
356

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AThe total resistance is 2 kΩ.
BThe parallel pair gives (2 × 2) ÷ (2 + 2) = 1 kΩ.
CThe series resistor adds another 1 kΩ.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Hazard means anything with the potential to cause harm.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Designing and Manufacturing Products, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.