levo

The Chemical Industry

Costs, benefits and risks of industrial processes

  • 4 things to know
  • Components 01, 02 and 03

Overview

Recall questions on saleable co-products, the double cost of a by-product, energy recovery, plant capacity and location.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Numbers

How does a saleable co-product improve the economics of a process, why is an unwanted by-product a double cost, and how does raising the yield from 60% to 75% change the raw material needed?

Process

Why is energy recovery designed into a chemical plant, why does running below design capacity raise the cost per tonne, and how does the location of a plant affect its costs?

Evaluation

Why is the transport of a chemical sometimes riskier than its manufacture?

Evaluation

Why can the hazard of a substance never be reduced by a change in working practice, whereas the risk can?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Name four categories of cost that must be considered when running an industrial chemical process.

    Model answer

    The cost of raw materials, the cost of energy, the capital and maintenance costs of the plant, and the cost of dealing with by-products and waste.

  2. 2

    What is a fixed cost in the context of a chemical plant?

    Model answer

    A cost that must be paid whether or not the plant is producing, such as the capital repayment on the buildings and reactors.

  3. 3

    Give two examples of variable costs.

    Model answer

    Raw materials and energy, since both scale with the quantity of product made.

  4. 4

    How does a saleable co-product improve the economics of a process?

    Model answer

    Income from selling it offsets the production costs and reduces the amount of waste that must be treated.

  5. 5

    Why is an unwanted by-product a double cost?

    Model answer

    Reactant mass has been used to make something worthless, and money must then be spent treating or disposing of it safely.

  6. 6

    A plant makes 500 tonnes of product a day and needs 0.80 tonne of raw material per tonne of product, at £220 per tonne. Calculate the daily raw material cost.

    Model answer

    The plant uses 400 tonnes a day, so the cost is 400 × £220 = £88 000.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

See a huge jump in your memorisation

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Development of Practical Skills in Chemistry
Elements of Life
Developing Fuels
Elements From the Sea

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A acid is formed.
carboxylicnitricfatty

Blank Blitz consolidates the facts

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

A3 ⁴₂He → ¹²₆C.
B¹²₆C + ⁴₂He → ¹⁶₈O.
C¹⁶₈O + ⁴₂He → ²⁰₁₀Ne.

Build It trains answer structure

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Nitrogen is +2 in NO and +4 in NO₂.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in The Chemical Industry, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.