What is a budget variance, and how is one worked out?

Key term

What can push costs above budget, and what can push revenue above it?

Key term

What is a budget variance?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is a budget variance?

    Model answer

    A budget variance is the difference between a budgeted figure and the actual figure achieved. Variances are calculated for revenue, for costs and for profit.

  2. 2

    How is a budget variance calculated?

    Model answer

    The budgeted figure is subtracted from the actual figure for the same item and period. The size of the gap is then labelled favourable or adverse.

  3. 3

    What makes a variance favourable?

    Model answer

    A variance is favourable when the actual outcome leaves the business better off than the budget assumed. Higher revenue and lower costs each produce favourable variances.

  4. 4

    What makes a variance adverse?

    Model answer

    A variance is adverse when the actual outcome leaves the business worse off than budgeted. Lower revenue and higher costs each produce adverse variances.

  5. 5

    Budgeted labour cost was £45,000 and actual labour cost was £48,000. Calculate the variance and state its type.

    Model answer

    Actual cost exceeds budget by £3,000. The variance is adverse, because the extra spending reduces profit.

  6. 6

    Budgeted sales revenue was £250,000 and actual revenue was £268,000. Calculate the variance and state its type.

    Model answer

    Actual revenue exceeds budget by £18,000. The variance is favourable, because the extra income raises profit.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Enterprise, Business Plans and Location
Markets, Demand and Market Research
Business Structure and Sources of Finance
Revenue, Costs and Break-Even

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

£240,000 by £120,000 gives 2.
dividedmultipliedadded

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ASoftware produces a result from whatever data it is given.
BPoor data produces a confident but wrong answer.
CSystems are also costly to buy, maintain and staff.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Capacity is the maximum output possible.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Analysing Business Performance, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.