Operations Management

Capacity utilisation

  • 3 things to know
  • Component 1

Overview

Capacity utilisation and subcontracting as a way of using spare capacity.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What is meant by capacity?

Key term

What is meant by capacity utilisation?

Numbers

State the formula for capacity utilisation.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is meant by capacity?

    Model answer

    Capacity is the maximum output a business can produce in a period with its current resources. Machinery, premises and staffing all set the limit.

  2. 2

    What is meant by capacity utilisation?

    Model answer

    Capacity utilisation is the proportion of maximum possible output that a business actually produces. The figure is expressed as a percentage.

  3. 3

    State the formula for capacity utilisation.

    Model answer

    Capacity utilisation equals actual output divided by maximum possible output, multiplied by 100. A percentage of full capacity is what the formula gives.

  4. 4

    A factory produces 7,200 units in a month against a maximum of 9,000. Calculate its capacity utilisation.

    Model answer

    The calculation is 7,200 divided by 9,000, multiplied by 100. Capacity utilisation is 80%.

  5. 5

    A hotel with 120 rooms lets 90 of them on a given night. Calculate its capacity utilisation.

    Model answer

    The calculation is 90 divided by 120, multiplied by 100. Capacity utilisation is 75%.

  6. 6

    Why does high capacity utilisation lower unit costs?

    Model answer

    Fixed costs such as rent and insurance are spread over a larger output. The fixed cost carried by each unit therefore falls.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Enterprise, Business Plans and Location
Markets, Demand and Market Research
Business Structure and Sources of Finance
Revenue, Costs and Break-Even

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

£240,000 by £120,000 gives 2.
dividedmultipliedadded

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ASoftware produces a result from whatever data it is given.
BPoor data produces a confident but wrong answer.
CSystems are also costly to buy, maintain and staff.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Capacity is the maximum output possible.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Operations Management, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.