levo

Revenue, Costs and Break-Even

Fixed, variable and semi-variable costs

  • 3 things to know
  • Component 1

Overview

Fixed costs, variable costs and semi-variable cost.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

How do fixed and variable cost per unit behave as output rises?

Key term

Define fixed costs.

Key term

Define variable costs.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Define fixed costs.

    Model answer

    Fixed costs are costs that do not change with the level of output. Rent, business rates, insurance and salaried staff are typical fixed costs.

  2. 2

    Define variable costs.

    Model answer

    Variable costs are costs that change directly in proportion to output. Raw materials, packaging and piece-rate wages are typical variable costs.

  3. 3

    What is a semi-variable cost?

    Model answer

    A semi-variable cost has a fixed element and a variable element. A mobile phone contract with a monthly line rental plus a charge per call is semi-variable.

  4. 4

    Give an example of a semi-variable cost in a delivery business and explain both parts.

    Model answer

    A delivery van carries fixed annual road tax and insurance whatever the mileage. Fuel is the variable element because fuel spending rises with every mile driven.

  5. 5

    A workshop pays £300 a month for machine hire plus £2 for every hour the machine runs. Calculate the cost of a month in which the machine runs for 250 hours.

    Model answer

    The variable element is 250 × £2, which comes to £500. The fixed hire charge of £300 is then added, so the total cost is £800.

  6. 6

    Explain what happens to fixed cost per unit as output rises.

    Model answer

    Fixed cost per unit falls as output rises because the same total fixed cost is spread over more units. A business producing 10,000 units carries a lower fixed cost per unit than one producing 1,000.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Enterprise, Business Plans and Location
Markets, Demand and Market Research
Business Structure and Sources of Finance
Revenue, Costs and Break-Even

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

£240,000 by £120,000 gives 2.
dividedmultipliedadded

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ASoftware produces a result from whatever data it is given.
BPoor data produces a confident but wrong answer.
CSystems are also costly to buy, maintain and staff.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

Capacity is the maximum output possible.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Revenue, Costs and Break-Even, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.