levo

Implementation and System Security

  • 12 subtopics
  • 36 things to know
  • AS Unit 1

What Implementation and System Security covers

Implementation and System Security is examined in Unit AS 1, Approaches to Systems Development. It covers the purpose of system implementation, direct and parallel changeover, pilot and phased changeover, user documentation, technical documentation, data conversion, the purpose of system maintenance, corrective, adaptive and perfective maintenance, archiving data, backup and recovery, full, differential and incremental backups and disaster recovery plans.

Where it is assessed

AS Unit 1

Approaches to Systems Development.

Check the CCEA specification ↗

The 12 subtopics

Each one has its own page.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why is implementation planned in detail before it begins?

Evaluation

Give two advantages of parallel running.

Key term

Name five sections found in a typical user guide.

Key term

Why is data conversion needed even when both systems are computerised?

Key term

Why is file format obsolescence a problem for archives?

Key term

Name five items found in a typical disaster recovery plan.

Key term

Describe pilot changeover.

Key term

What is technical documentation?

Key term

Why does maintenance usually cost more over a system's life than the original development did?

Key term

Name the three forms of system maintenance.

Key term

Name four events a backup protects an organisation against.

Key term

What is a full backup?

Key term

Name four activities that take place during implementation.

Key term

What is meant by changeover?

Evaluation

Give two advantages of pilot changeover.

Key term

What is user documentation?

Key term

Name five items found in technical documentation.

Key term

Give one drawback of converting data by manual re-entry.

Key term

Why are changes to a live system controlled formally?

Key term

What is corrective maintenance?

Key term

What is data archiving?

Key term

What is meant by recovery?

Key term

What is a differential backup?

Key term

Name four events a disaster recovery plan prepares for.

Key term

Why is a quiet period often chosen for a changeover?

Evaluation

Give two advantages of direct changeover.

Evaluation

Give two disadvantages of pilot changeover.

Key term

Why does user documentation avoid technical language?

Key term

Who is the audience for technical documentation?

Key term

Why is data cleansed before transfer rather than afterwards?

Key term

What is an impact analysis?

Key term

Give an example of corrective maintenance.

Key term

How does archiving improve the performance of a live system?

Key term

Why must a backup be stored away from the computers it protects?

Key term

Why do differential backups grow larger through the week?

Key term

Why is a disaster recovery plan written before anything has happened?

Take Implementation and System Security further

The same content, four other ways.

Commonly confused

Pairs that lose marks when they are blurred together.

  • Archiving vs Backup

    Archiving: moving data no longer needed day to day onto long-term storage and usually deleting the original. Backup: copying data still in use so it can be restored after a loss.

  • Corrective maintenance vs Adaptive maintenance

    Corrective maintenance: repairing software that is failing to do what it was specified to do. Adaptive maintenance: changing software that works perfectly well, so that it keeps working when the law, the business or the platform around it changes.

  • Data conversion vs Data cleansing

    Data conversion: changing the structure and format of records so a new system can hold them. Data cleansing: correcting the content of those records, removing duplicates and filling gaps.

Questions from this topic

Each one with the model answer underneath.

  1. 1

    What is meant by system implementation?

    Model answer

    System implementation is the stage in which a tested system is put into live use, covering installation, data conversion, user training, documentation and the changeover from the old way of working.

  2. 2

    Name four activities that take place during implementation.

    Model answer

    Implementation installs the hardware and software, converts and loads the existing data, trains the users, and carries out the changeover to the new system.

  3. 3

    Why is implementation planned in detail before it begins?

    Model answer

    The organisation must keep working while the change happens, so the order of tasks, the timing and the staff involved are all fixed in advance to keep the disruption short and controlled.

  4. 4

    Why is a quiet period often chosen for a changeover?

    Model answer

    A period of low activity, such as overnight or a slack trading season, means fewer transactions are affected if something goes wrong and staff have time to get used to the new system.

  5. 5

    Give three methods of training users on a new system.

    Model answer

    Users can be trained in formal classroom sessions, by working through online tutorials at their own pace, or by a trained colleague coaching them at their desk.

  6. 6

    What is a cascade approach to training?

    Model answer

    In a cascade approach a small group of staff is trained thoroughly and each of them then trains their own colleagues, so the training spreads quickly and cheaply through a large organisation.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Implementation and System Security revision questions

What does Implementation and System Security cover in CCEA A-Level Digital Technology?
12 subtopics: the purpose of system implementation, direct and parallel changeover, pilot and phased changeover, user documentation, technical documentation, data conversion, the purpose of system maintenance, corrective, adaptive and perfective maintenance, archiving data, backup and recovery, full, differential and incremental backups and disaster recovery plans. Each one has its own page with questions and model answers.
How is Implementation and System Security organised?
By the CCEA 2650 specification, subtopic by subtopic, so it matches the order you are taught it in.

Every question in Implementation and System Security, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.