Corrective maintenance, adaptive maintenance and service level agreement.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What has to be in place before a system goes live?

Key term

Why is the backup arrangement tested before going live rather than after?

Key term

Why is most of the money spent on a system spent after it is delivered?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What has to be in place before a system goes live?

    Model answer

    Before going live the system must be installed and tested in its live environment, the existing data transferred and verified, the users trained, the documentation delivered, the backup arrangements working, and the fallback plan agreed.

  2. 2

    Why is the backup arrangement tested before going live rather than after?

    Model answer

    A backup that has never been restored is not known to work, and a client discovers the fault at the only moment it matters. Restoring a test copy before going live is what proves the arrangement.

  3. 3

    What is a pilot, and what does it achieve?

    Model answer

    A pilot runs the new system for one part of the organisation while the rest continues as before. It exposes the system to real work and real users at a scale where problems can be absorbed, before the whole organisation depends on it.

  4. 4

    What is the drawback of running the old and new systems side by side?

    Model answer

    Running both means every transaction is entered twice, which doubles the workload for the period and needs staff the organisation may not have, so it buys safety at a cost that is not always affordable.

  5. 5

    Why is a period of close support planned immediately after going live?

    Model answer

    The first days generate almost all of the questions and reveal the problems that testing missed, so having someone available then resolves them before they become habits or workarounds.

  6. 6

    What is corrective maintenance?

    Model answer

    Corrective maintenance is work done to fix faults found after the system is in use, which are almost always ones the tests did not cover rather than ones they missed.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in The Development Project: Build, Testing and Evaluation, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.