Pilot and phased changeover

  • 3 things to know
  • AS Unit 1

Overview

Pilot changeover, phased changeover and four changeover methods.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Describe pilot changeover.

Evaluation

Give two advantages of pilot changeover.

Evaluation

Give two disadvantages of pilot changeover.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Describe pilot changeover.

    Model answer

    In pilot changeover the whole new system is introduced in one part of the organisation first, such as a single branch or department, while everywhere else carries on with the old system.

  2. 2

    Give two advantages of pilot changeover.

    Model answer

    A problem affects only the pilot site rather than the whole organisation, and the staff there become experienced users who can help train everyone else.

  3. 3

    Give two disadvantages of pilot changeover.

    Model answer

    The full rollout takes a long time because it waits for the pilot to be evaluated, and running two different systems in different parts of the organisation is awkward to manage.

  4. 4

    How is a pilot site chosen?

    Model answer

    A pilot site is chosen to be typical enough for its results to apply elsewhere, while being small enough and low enough in risk that a failure there would not damage the organisation.

  5. 5

    Describe phased changeover.

    Model answer

    In phased changeover the new system is brought in one part at a time across the whole organisation, so one function moves over, is proved, and then the next follows.

  6. 6

    Give two advantages of phased changeover.

    Model answer

    Training and support can be concentrated on one function at a time, and a fault affects only the part that has just moved rather than everything at once.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Implementation and System Security, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.