levo

The Development Project: Build, Testing and Evaluation

Documentation for the completed system

  • 3 things to know
  • A2 Unit 2

Overview

What is handed over with a finished system, what the technical documents must record about the data and the processing, why decisions and their reasons are written down, and the test of whether the documentation is adequate.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

How does documentation relate to the handover of the system?

Key term

What documentation is delivered with a completed system?

Key term

Why is technical documentation delivered to the client rather than kept by the developer?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What documentation is delivered with a completed system?

    Model answer

    A completed system is delivered with user documentation explaining how to operate it, and technical documentation recording how it is built — the data model, the module descriptions, the algorithms, the test plan and log, and the installation details.

  2. 2

    Why is technical documentation delivered to the client rather than kept by the developer?

    Model answer

    The client owns the system and may use someone else to maintain it, so the knowledge of how it works has to be handed over with it, or the client is tied to one developer for the system's life.

  3. 3

    What should technical documentation contain about the data?

    Model answer

    It should contain the entity-relationship diagram, every table with its attributes, types, sizes, keys and validation, the relationships and the integrity rules, and the normalisation that produced the structure.

  4. 4

    What should technical documentation contain about the processing?

    Model answer

    It should contain a description of each module and its purpose, the algorithms for anything involving calculation, decision or repetition, and the interfaces between modules, including the data each passes.

  5. 5

    Why is the test plan and its log part of the delivered documentation?

    Model answer

    They are the evidence that the system was checked against its requirements, and they give a maintainer a ready set of tests with known correct answers to re-run after any future change.

  6. 6

    What should the installation documentation record?

    Model answer

    It should record the hardware and software the system requires, the steps to install it, any configuration settings, the licences held, and how backups are taken and restored.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in The Development Project: Build, Testing and Evaluation, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.