CCEA A-Level Digital Technology 2650
Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming
Data, Information and Data Representation
Computer Architecture and Processing Systems
System Software, Application Software and the User Interface
Web Technology and Multimedia
Networks
Databases
Artificial Intelligence, Expert Systems and Robotics
Mobile Technology, Data Mining and Cloud Computing
Individual, Social and Legal Considerations
The Development Project: Analysis and Design
The Development Project: Build, Testing and Evaluation
The Development Project: Build, Testing and Evaluation
Documenting a strategy for system implementation
- 3 things to know
- A2 Unit 2
Overview
Implementation strategy, data transfer and fallback plan.
What you need to know
Answer each one before you reveal it.
Why must the strategy be documented rather than agreed verbally?
What should the installation section of the strategy cover?
Questions from this subtopic
Each one with the model answer underneath.
- 1
What is an implementation strategy?
Model answer
An implementation strategy is the documented plan for getting the system into live use: how it is installed, how existing data is transferred, how the switch from the old way of working is made, how users are trained, and what happens if something goes wrong.
- 2
Why must the strategy be documented rather than agreed verbally?
Model answer
Going live involves the client's staff and their working data, and a documented plan lets them see what is expected of them and when, and lets everyone check afterwards that each step was completed.
- 3
What should the installation section of the strategy cover?
Model answer
The installation section covers what is installed where, in what order, who does it, what has to be in place first, how long the machines are unavailable, and when it happens.
- 4
Why is timing part of the strategy?
Model answer
Going live disrupts work, so the moment is chosen for the client's business — outside the busy period, at the end of an accounting month, or during a closure — rather than for the developer's convenience.
- 5
What is data transfer, and why is it planned in advance?
Model answer
Data transfer is moving the client's existing records into the new system. It is planned because the old data will not match the new structure exactly, and deciding how to map it while the system is live is far too late.
- 6
How is transferred data checked?
Model answer
The count of records transferred is compared with the count in the source, key totals such as balances are compared, and a sample of individual records is checked field by field against the original.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in The Development Project: Build, Testing and Evaluation, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.