CCEA A-Level Digital Technology 2650
Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming
Data, Information and Data Representation
Computer Architecture and Processing Systems
System Software, Application Software and the User Interface
Web Technology and Multimedia
Networks
Databases
Artificial Intelligence, Expert Systems and Robotics
Mobile Technology, Data Mining and Cloud Computing
Individual, Social and Legal Considerations
The Development Project: Analysis and Design
The Development Project: Build, Testing and Evaluation
The Development Project: Analysis and Design
Prioritising requirements as essential and non-essential
- 3 things to know
- A2 Unit 2
Overview
Essential requirement for a school library system, with a justification, non-essential requirement for the same system, with a justification and scope creep.
What you need to know
Answer each one before you reveal it.
How does prioritisation interact with the constraints identified in analysis?
What should happen if an essential requirement turns out to be unbuildable within the constraints?
Questions from this subtopic
Each one with the model answer underneath.
- 1
Why are user requirements prioritised?
Model answer
Time and money always run out before the wish list does, so the requirements are ranked in advance and the essential ones are built first. Without a ranking the decision is made under pressure at the end, and something necessary is dropped.
- 2
What makes a requirement essential?
Model answer
A requirement is essential when the system cannot do its job without it: the client's core task fails, a legal obligation is unmet, or the data the system exists to hold cannot be stored or retrieved.
- 3
What makes a requirement non-essential?
Model answer
A requirement is non-essential when its absence leaves the system usable, if less convenient — an extra report, a keyboard shortcut, or a more attractive layout.
- 4
Why must a priority be justified rather than simply asserted?
Model answer
The justification is what allows the client to disagree before the work is planned, and it records the reasoning for whoever revisits the decision later when the pressure to cut is real.
- 5
Who should decide the priority of a requirement?
Model answer
The client decides, because priority is a judgement about the business rather than about the technology. The developer advises on what each requirement will cost to build.
- 6
Give an example of an essential requirement for a school library system, with a justification.
Model answer
Recording which member has borrowed which copy is essential, because the system exists to know where the stock is, and without it no overdue can be chased and no loan returned against the right record.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in The Development Project: Analysis and Design, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.