levo

Systems Analysis and Development Approaches

The software crisis and the need for systems development

  • 3 things to know
  • AS Unit 1

Overview

Two consequences for an organisation whose software project fails and legacy system.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Explain why poorly written software stays expensive long after it is delivered.

Numbers

Where was the term ‘software crisis’ first used?

Key term

Give three symptoms of the software crisis.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does the term ‘software crisis’ describe?

    Model answer

    The software crisis describes the period in which software projects routinely ran late, cost far more than planned and delivered unreliable systems, because software development could not keep pace with rapidly growing hardware power.

  2. 2

    Where was the term ‘software crisis’ first used?

    Model answer

    The term ‘software crisis’ was first used at a NATO conference on software engineering held in Germany in 1968.

  3. 3

    Give three symptoms of the software crisis.

    Model answer

    Projects overran their deadlines, projects exceeded their budgets, and the software delivered was often unreliable or did not do what the user had asked for.

  4. 4

    Why did more powerful hardware make the software crisis worse?

    Model answer

    Cheaper and faster hardware allowed far more ambitious systems to be attempted, and the informal methods that worked for small programs could not manage the complexity of the much larger systems that became possible.

  5. 5

    How did the software crisis lead to the discipline of software engineering?

    Model answer

    The scale of the failures showed that building software needed the same disciplined, planned approach as other branches of engineering, so lifecycle models, documented methods and formal project management were introduced.

  6. 6

    State two consequences for an organisation whose software project fails.

    Model answer

    The organisation loses the money already spent on the project and must carry on running an inadequate existing system, and it may lose customers to competitors whose systems work.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Systems Analysis and Development Approaches, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.