Systems Analysis and Development Approaches

Project management, Gantt charts and critical path analysis

  • 3 things to know
  • AS Unit 1

Overview

Project management, four activities a project manager performs and milestone in a project plan.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why does a project manager use a Gantt chart and critical path analysis together?

Key term

What is project management?

Key term

Name four activities a project manager performs.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is project management?

    Model answer

    Project management is the planning, scheduling, monitoring and control of the work needed to deliver a system on time, within budget and to the agreed standard.

  2. 2

    Name four activities a project manager performs.

    Model answer

    A project manager breaks the work into tasks, estimates and schedules them, allocates staff and resources to them, and monitors progress against the plan.

  3. 3

    What is a milestone in a project plan?

    Model answer

    A milestone is a checkpoint marking the completion of a significant part of the work, and progress is reported by the milestones reached.

  4. 4

    What is a deliverable?

    Model answer

    A deliverable is an item the project must hand over, such as the requirements specification, the tested program or the user documentation.

  5. 5

    What is a work breakdown structure?

    Model answer

    A work breakdown structure splits the whole project into successively smaller tasks until each task is small enough to be estimated, assigned and tracked.

  6. 6

    What does a Gantt chart show?

    Model answer

    A Gantt chart shows each task of a project as a horizontal bar drawn against a calendar, so the start, the duration and the overlap of tasks can all be read at once.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Systems Analysis and Development Approaches, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.