Overview

System implementation, four activities that take place during implementation and cascade approach to training.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why is implementation planned in detail before it begins?

Key term

Name four activities that take place during implementation.

Key term

Why is a quiet period often chosen for a changeover?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is meant by system implementation?

    Model answer

    System implementation is the stage in which a tested system is put into live use, covering installation, data conversion, user training, documentation and the changeover from the old way of working.

  2. 2

    Name four activities that take place during implementation.

    Model answer

    Implementation installs the hardware and software, converts and loads the existing data, trains the users, and carries out the changeover to the new system.

  3. 3

    Why is implementation planned in detail before it begins?

    Model answer

    The organisation must keep working while the change happens, so the order of tasks, the timing and the staff involved are all fixed in advance to keep the disruption short and controlled.

  4. 4

    Why is a quiet period often chosen for a changeover?

    Model answer

    A period of low activity, such as overnight or a slack trading season, means fewer transactions are affected if something goes wrong and staff have time to get used to the new system.

  5. 5

    Give three methods of training users on a new system.

    Model answer

    Users can be trained in formal classroom sessions, by working through online tutorials at their own pace, or by a trained colleague coaching them at their desk.

  6. 6

    What is a cascade approach to training?

    Model answer

    In a cascade approach a small group of staff is trained thoroughly and each of them then trains their own colleagues, so the training spreads quickly and cheaply through a large organisation.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Systems Analysis and Development Approaches
Design, Development and Testing
Implementation and System Security
Programming

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A check requires a value.
presencerangeformat

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

ANormal data is 12, which should be accepted.
BBoundary data is 1 and 50, which should be accepted.
C0 and 51, just outside the limits, should be rejected.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

One byte is made up of 8 bits.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Implementation and System Security, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.