OCR A-Level Psychology H567
Research Methods and Techniques
Planning and Conducting Research
Data Recording, Analysis and Presentation
Report Writing and Scientific Communication
Practical Activities and the Nature of Science
Mathematical Requirements for Research Methods
Studying and Evaluating the Core Studies: The Common Framework
Core Studies: Social Area
Core Studies: Cognitive Area
Core Studies: Developmental Area
Core Studies: Biological Area
Core Studies: Individual Differences Area
Areas and Perspectives in Psychology
Debates in Psychology
Practical Applications of Psychology
Issues in Mental Health
Child PsychologyApplied option
Criminal PsychologyApplied option
Environmental PsychologyApplied option
Sport and Exercise PsychologyApplied option
Methodological Issues and Debates Running Through Applied Psychology
Environmental Psychology
Czeisler et al. (1982) rotating shift schedules: background, method and sleep findings
- 3 things to know
- Component 03
Overview
Recall questions on the aim of Czeisler et al.'s 1982 study of rotating shift schedules, the circadian principles applied, the workers, the previous schedule, method, intervention groups, data collection, and findings on sleep and preferred rotation direction.
What you need to know
Answer each one before you reveal it.
Who took part in Czeisler et al.'s study?
What research method was used?
Questions from this subtopic
Each one with the model answer underneath.
- 1
What was the aim of Czeisler et al.'s (1982) study?
Model answer
To investigate the effects of rotating shift work on workers' sleep, health and satisfaction, and to test whether redesigning the schedule using circadian principles would improve them.
- 2
Which two circadian principles were applied to the new schedules?
Model answer
Rotating the shifts forwards in a phase-delay direction, and lengthening the interval between changes from 7 days to 21 days.
- 3
Who took part in Czeisler et al.'s study?
Model answer
153 male workers aged 19 to 68 at a chemical plant in Utah, of whom 85 worked a weekly rotating shift and the remainder worked non-rotating schedules.
- 4
What schedule were the rotating workers on before the intervention?
Model answer
They changed shift every week and the rotation ran backwards in a phase-advance direction, so each new shift began earlier than the last.
- 5
What research method was used?
Model answer
A field experiment combined with questionnaire surveys, first comparing rotating with non-rotating workers and then testing new schedules on the rotating workers.
- 6
How were the rotating workers divided for the intervention?
Model answer
All were moved to a phase-delay rotation and were then randomly assigned either to continue changing every 7 days or to change every 21 days.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in Environmental Psychology, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.