Monitoring and controlling progress

  • 3 things to know
  • A2 Unit 1

Overview

Difference between monitoring a project and controlling it, exception report and issue log.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

Why is percentage complete an unreliable measure of progress?

Key term

How does a manager tell the difference between an activity that is late and a plan that was wrong?

Key term

What is the difference between monitoring a project and controlling it?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What is the difference between monitoring a project and controlling it?

    Model answer

    Monitoring is collecting information about what has actually happened, while controlling is taking action on that information, such as re-planning, moving resources or reducing scope.

  2. 2

    Name three sources of information a manager uses to judge real progress.

    Model answer

    Timesheets showing effort actually spent, completed deliverables that can be inspected, and checkpoint reports from team leaders are three sources of information about real progress.

  3. 3

    Why is percentage complete an unreliable measure of progress?

    Model answer

    Percentage complete relies on a guess about the work remaining rather than on anything observable, so an activity can be reported as ninety per cent finished for weeks. Completed deliverables and passed milestones are far harder to misjudge.

  4. 4

    What is an exception report?

    Model answer

    An exception report is raised when a part of the project moves outside agreed limits of time or cost, so that senior management is asked to act only when something genuinely needs a decision.

  5. 5

    What is slippage?

    Model answer

    Slippage is the difference between the planned date for an activity or milestone and the date now forecast or actually achieved.

  6. 6

    Two weeks into a ten-week stage, 30 per cent of the effort has been spent and 15 per cent of the work is done. What does that suggest?

    Model answer

    Spending 30 per cent of the effort for 15 per cent of the work suggests the stage was underestimated by roughly a factor of two, so the forecast should be revised immediately rather than waiting for the trend to be confirmed.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A null is the of one.
absencepresencetype

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AA null means no value has been recorded.
BZero and an empty string are values.
CA null is the absence of a value.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.