Network diagrams and PERT

  • 3 things to know
  • A2 Unit 1

Overview

Drawing tasks and their dependencies as a network, the forward and backward pass, earliest and latest start and finish, and the three-point estimate that averages optimistic, likely and pessimistic times.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Key term

What does PERT add to a network analysis?

Key term

What does a network diagram show that a bar chart does not?

Key term

Describe the activity-on-node form of a network diagram.

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    What does a network diagram show that a bar chart does not?

    Model answer

    A network diagram shows the logical dependencies between activities as a connected structure, so the chains running through the project and the longest of those chains can be identified.

  2. 2

    Describe the activity-on-node form of a network diagram.

    Model answer

    In the activity-on-node form each activity is drawn as a box carrying its name, duration and calculated dates, and the arrows between boxes carry only the dependencies.

  3. 3

    How does the activity-on-arrow form differ, and what is a dummy activity?

    Model answer

    In the activity-on-arrow form the arrows are the activities and the circles are events at their ends, and a dummy activity is a dotted arrow of zero duration used to express a dependency that the layout could not otherwise show.

  4. 4

    What does a forward pass through a network calculate?

    Model answer

    A forward pass works from the start to the end of the network calculating the earliest start and earliest finish of every activity, and the largest earliest finish gives the shortest possible duration for the whole project.

  5. 5

    When an activity has two predecessors, how is its earliest start found?

    Model answer

    An activity with two predecessors takes the later of their earliest finish times as its earliest start, because the activity cannot begin until both of the things it depends on are done.

  6. 6

    What does a backward pass calculate, and where does it begin?

    Model answer

    A backward pass begins at the project end date and works towards the start, calculating the latest finish and latest start of each activity, meaning the last moment it could happen without delaying the project.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A null is the of one.
absencepresencetype

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AA null means no value has been recorded.
BZero and an empty string are values.
CA null is the absence of a value.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Managing Projects, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.