CCEA A-Level Software Systems Development CL4
Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures
Exception Handling and Managing Input and Output
Testing an Object Oriented Application
Graphical User Interface Objects and Events
Multiple Forms and Linking to Files
Designing, Testing and Evaluating an Event Driven Application
Reasons for Systems Development and Systems Methodologies
Managing Projects
Testing Strategies
Database Concepts and Entity Relationship Modelling
Normalisation and Structured Query Language
Project Management and the Systems Approach in Practice
Defining Requirements and Documenting the Design
Building a Desktop Solution with a Database
Testing and Evaluating the Solution
Testing and Evaluating the Solution
Planning the testing of the finished solution
- 3 things to know
- A2 Unit 2
Overview
What a testing procedure for a finished solution sets out, order in which the parts of a solution are tested and six columns a table of planned tests should contain.
What you need to know
Answer each one before you reveal it.
Why is the testing planned before the solution is finished?
State the order in which the parts of a solution are tested.
Questions from this subtopic
Each one with the model answer underneath.
- 1
State what a testing procedure for a finished solution sets out.
Model answer
A testing procedure sets out what will be tested, in what order, with what data, by whom, and what result is expected.
- 2
Why is the testing planned before the solution is finished?
Model answer
Tests written from the requirements cannot be bent to fit the code, and planning early makes sure time is set aside for them.
- 3
State the order in which the parts of a solution are tested.
Model answer
Individual modules are tested first, then modules joined together, then the whole solution, and finally the solution with the user.
- 4
Name the six columns a table of planned tests should contain.
Model answer
The table gives the test number, its purpose, the data used, the expected result, the actual result and a pass or fail decision.
- 5
Why does every planned test carry a number?
Model answer
The number links the test to its evidence, to the requirement it checks, and to any retest run after a fault is corrected.
- 6
How are the tests derived from the user requirements?
Model answer
Each numbered requirement generates at least one test, so a requirement with no test has never been shown to work.
Other ways to work this
The same content, four other ways.
What is inside Levo
Six ways to work the same material.
Every question in Testing and Evaluating the Solution, on a schedule.
Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.
Or £46 a year, about £3.83 a month. Cancel anytime.