levo

Testing Strategies

The personnel involved in testing

  • 3 things to know
  • A2 Unit 1

Overview

Value of independent testers, role of quality assurance in testing procedures and role of the system operator or support staff in testing.

What you need to know

Answer each one before you reveal it.

Your recallNot started
Process

Which personnel are typically involved in testing procedures on a large project?

Key term

What does a test manager do?

Key term

Why is a user a poor choice for white box testing?

Questions from this subtopic

Each one with the model answer underneath.

  1. 1

    Which personnel are typically involved in testing procedures on a large project?

    Model answer

    Testing typically involves the developers who unit test their own modules, an independent test team, a test manager, quality assurance staff, the business analyst who confirms intent, and the end users who carry out acceptance testing.

  2. 2

    What does a test manager do?

    Model answer

    A test manager plans the testing effort, decides what will be tested and to what depth, allocates testers and equipment, tracks progress and defect trends, and advises whether the software is fit to release.

  3. 3

    What is the value of independent testers?

    Model answer

    Independent testers have no stake in the code being right, so they are willing to try the input the developer assumed nobody would enter and to report faults that reflect badly on the schedule.

  4. 4

    Why is a developer still expected to test their own code despite that lack of independence?

    Model answer

    A developer finds and fixes the obvious faults in minutes while the code is fresh, and passing untested work to an independent tester wastes the more expensive resource on defects the author could have removed immediately.

  5. 5

    What contribution does the business analyst make during testing?

    Model answer

    The business analyst settles disputes about whether observed behaviour is a fault or the requirement working as agreed, since the analyst holds the record of what the business actually asked for.

  6. 6

    What is the role of quality assurance in testing procedures?

    Model answer

    Quality assurance defines the testing standards and procedures the project must follow and then audits the evidence, confirming that the tests recorded as run really were run and that the results were signed off.

Other ways to work this

The same content, four other ways.

What is inside Levo

Six ways to work the same material.

1Closed book
2Open book
3Closed book

The 3-step method, run for you

Answer cold, learn it, then prove it stuck. Levo tracks the jump between your first attempt and your last.

Software and the Development Environment
Defining Data: Types, Variables and Classes
Program Control Structures
Objects, Classes and Data Structures

Cram a whole paper in one sitting

Sort every topic into what you know and what you do not, then drill only the weak ones.

A null is the of one.
absencepresencetype

Blank Blitz makes facts automatic

Rapid timed gap-fills on the terms and numbers you need to recall without thinking.

AA null means no value has been recorded.
BZero and an empty string are values.
CA null is the absence of a value.

Build It gets the exam shape right

Assemble a full-mark answer from its marking points, in the order an examiner wants them.

An error is the mistake a person made.
TrueFalse

Test It catches misconceptions

Spot the fault in a statement. The traps are the mistakes students actually make.

721941163128510

Brain Breaks between sessions

Short focus games to reset attention, so the next set lands better than the last.

Every question in Testing Strategies, on a schedule.

Attempt a question from memory, write the correct version, then attempt it again. Levo records the jump between your first attempt and your last, and brings each question back on the day you are due to forget it.

Or £46 a year, about £3.83 a month. Cancel anytime.